Rašyti komentarą...
Nuoroda nukopijuota
× Pranešti klaidą
Nu tai kaip nepasiseke anglams.14 mlr.£ kas yra apie 60mlr.lt.O mums tai atomine butu nieko nekainavus :DDD
kas yra naujos kartos ? yra III ir IV kartos.
Contract
Customer: EDF Energy.
Supplier: AREVA.
Supply scope: 2 EPR units Nuclear Steam Supply System (NSSS).
Net electric output: 2 x 1,600 MWe.
Reactor thermal output: 4,500 MWth.
Contract
Customer: EDF Energy.
Supplier: AREVA.
Supply scope: 2 EPR units Nuclear Steam Supply System (NSSS).
Net electric output: 2 x 1,600 MWe.
Reactor thermal output: 4,500 MWth.
@Areva ir suomijoj Areva
EPR™ reactor: the very high power reactor (1,650 MWe) bla, bla, bla,,,
Construction of the EPR™ reactor at Flamanville in September 2009
Safety and operational performance are the key strengths of the EPR™ reactor. This pressurized water model is also the first generation III+ reactor to be deployed on an international scale, being built in three different countries.
EPR™ reactor: the very high power reactor (1,650 MWe) bla, bla, bla,,,
Construction of the EPR™ reactor at Flamanville in September 2009
Safety and operational performance are the key strengths of the EPR™ reactor. This pressurized water model is also the first generation III+ reactor to be deployed on an international scale, being built in three different countries.
REKLAMA
REKLAMA
Didžiojoje Britanijoje pritarta pirmajai naujos kartos atominės elektrinės statybai